Projects

- FEED Design for the Soft Yoke Mooring of Nuclear Power Platform;

CSIC 719 Institute is intended to build a nuclear ocean platform in Bohai Bay, China. The platform will be moored using soft yoke mooring system. CSIC 719 Institute has authorized Shanghai SPM to organize the EPCI affairs of the mooring system on the nuclear ocean platorm. Accoridng to the cooperation agreement between CSIC 719 Institute and Shanghai SPM, a joint design group has been constructed and leaded by Shanghai SPM to design the soft yoke mooring system. The FEED design has been completed and detail design will be started subsequently.

- Cenceptual Design for a CALM System;

Shanghai SPM has completed a FEED design of a 300,000 DWT CALM for a secret client. The job includes site selection, feasibility assessment, hydrodynamic analysis, mooring system design and main scantlings determination.